A 3.1 mile double track extension in Mesa, Arizona. Construction began in the summer of 2012. Project finished 7 months ahead of schedule.

Central Mesa Light Rail, OCS & Switches

MAC designed and supplied the OCS cantilevers, balance weight assemblies, section insulators, standard and custom steel brackets and various assemblies. Special designs were required for fluted pole brackets and artistic curved cantilever pipes. On the substation side of the system, MAC provided three 3-gang fiberglass switch line-ups. The 2000A switches are bussed together in a feeder-tie-feeder configuration.

Complete System Supply